1. BigRentz
  2. Think Big Blog
  3. Top Rented Equipment in Data Center Construction

Top Rented Equipment in Data Center Construction

Top Rented Equipment in Data Center Construction

Data center construction demands precision. Procurement teams in this industry aren’t just renting equipment, they’re sourcing machines that align with strict operational requirements. 

Here are the top rented machines in data center construction and why they consistently lead demand. 

1. Electric Scissor Lifts 

As the most rented lift type across data center builds, they are primarily used to install overhead cable trays, lighting systems, HVAC components, and fire suppression systems. For teams managing large builds through national equipment rental, electric scissor lifts provide the standardization needed across multiple sites. 

Why It’s a Top Rented Choice: 

  • Zero emissions 
  • Quiet operation 
  • Safe for enclosed, climate-controlled spaces 

Typical Features: 

  • Platform heights from about 19 to 40 feet 
  • Compact widths for aisles and corridors 
  • Non-marking tires to protect finished floors 

Leading Brands: 

  • Genie Electric Scissor Lift 
  • JLG Electric Scissor Lift 
  • Skyjack Electric Scissor Lift 

View Electric Scissor Lifts

2. Electric Forklifts

As data halls move from shell to equipment installation, material handling becomes critical. Electric forklifts are primarily used to move servers, battery racks, switchgear, and packaged mechanical equipment. 

Why It’s a Top Rented Choice: 

  • No exhaust emissions 
  • Lower noise levels 
  • Continuous indoor operation 

Typical Features: 

  • 3,000 to 8,000 lb. capacities 
  • Cushion or non-marking tires 
  • Tight turning radius for narrow aisles 

Leading Brands: 

  • Toyota Material Handling 
  • Crown Equipment 
  • Mitsubishi Logisnext 
  • Caterpillar 
  • Yale 
  • Hyster 

Data center builds reflect new trends in construction technology, and electric forklifts support these precise installations without comprising air quality or noise standards. For procurement teams leveraging national equipment rentals, electric forklifts ensure consistency across phased builds in different states. 

3. Propane (LPG) Forklifts

When lifting demands increase, propane steps in. 

Why It’s a Top Rented Choice: 

  • Higher lifting capacity than many electric units 
  • Fast refueling 
  • Reliable performance in mixed indoor/outdoor environments (with proper ventilation) 

Typical Features: 

  • Capacities up to 10,000+ lb. 
  • More robust for uneven surfaces 

Leading Brands: 

  • Toyota Material Handling 
  • Crown Equipment 
  • Mitsubishi Logisnext 
  • Caterpillar 
  • Yale 
  • Hyster 

While electric machines dominate interior data halls, propane forklifts support the earlier construction phases. This balance reflects new trends in construction technology, where hybrid fleets are common across large infrastructure builds. 

For procurement in the construction industry, the ability to source both electric and propane models through a national equipment rental partner simplifies fleet coordination. 

View all Forklifts

Why These Machines Lead Data Construction Rentals 

Data center construction is different from traditional commercial builds. It requires clean energy equipment, compact footprints, minimal noise, and protection of finished flooring. 

These needs align directly with broader new trends in construction technology including electrification, indoor air control, and precision material handling. Procurement leaders in the construction industry are prioritizing these machines that reduce risk while improving install speed. 

The Procurement Advantage 

For enterprise builders, efficiency doesn’t come from one machine. It comes from the standardization of equipment across jobsites, reduction of sourcing friction, and the assurance that equipment is consistently available nationwide.  

A national equipment rental approach allows procurement teams to replicate successful equipment strategies from one data center build to the next. In this industry, that kind of repeatability drives efficiency and cost control.  

Build Smarter With BigRentz

Choosing the right construction vehicle types comes down to two things: the work in front of you and the conditions on site. When your equipment fits the workflow, you reduce bottlenecks, keep crews moving, and avoid costly rework or schedule slips.

BigRentz helps you source equipment that meets your project’s real demands. With an extensive fleet and hands-on experience across job-site applications, our team can help you align the right machines to your scope and timeline.

Explore our equipment rentals and find the right solutions for your next project.

Equipment Rental Guides

Download any of our free rental guides and learn how to pick the right equipment to fit your project needs.